NTPC commissions fourth part capacity of 50 MW of Nokhra Solar PV Project

Representational image

Team News Riveting

New Delhi, April 1

National Thermal Power Corporation (NTPC) Limited has commissioned the fourth part capacity of 50 MW of the Nokhra Solar PV Project located in Bikaner district of Rajasthan.

“Consequent upon successful commissioning, fourth part capacity of 50 MW out of 300 MW Nokhra Solar PV Project of NTPC Green Energy Limited (A wholly owned Subsidiary of NTPC Limited) at Bikaner, Rajasthan, is declared on Commercial Operation w.e.f. 00:00 Hrs. of 01.04.2023,” NTPC said in a regulatory filing today.

The first part capacity of 100 MW has already been declared on commercial operation w.e.f. 20.12.2022, second part capacity of 50 MW w.e.f. 30.12.2022 and third part capacity of 50 MW w.e.f. 16.02.2023. The total capacity declared on commercial operation of Nokhra Solar PV Project is now 250 MW, country’s largest power producer said.

With this, installed and commercial capacity of NTPC Green Energy Limited has become 2661 MW while group installed and commercial capacity of NTPC has become 71644 MW.

Leave a Reply

Your email address will not be published. Required fields are marked *