Team News Riveting
National Thermal Power Corporation (NTPC) Ltd, India’s largest power generation company, said that it’s total installed capacity had increased to 64,875 MW.
The unit-2 of 800 MW of Gadarwara Thermal Power Project in Madhya Pradesh has been added to the installed Capacity of NTPC with the successful completion of trial operation, the company said in a tweet.
“With this, the total installed capacity of NTPC and NTPC group has become 52,103 MW and 64,875 MW respectively.
The NTPC has 47 Stations (24 Coal based stations, 7 gas based stations, 1 Hydro station, 1 small hydro, 13 Solar PV and 1 Wind based Station) besides 25 Joint Venture stations (9 coal based, 4 gas based, 8 hydro, 1 small hydro 2 Wind and 1 Solar PV).
Last Friday, the company had commenced commercial operations for the Kameng Hydro-Electric Project, a part North Eastern Electric Power Corporation Ltd (a wholly-owned subsidiary company of NTPC Ltd).