NTPC completes trial operation of second unit at Barh Super Thermal Power Project
With this, installed capacity of NTPC Limited and NTPC group has become 57038 MW and 73024 MW respectively.
NTPC completes trial operation of second unit at Barh Super Thermal Power Project Read More