SAIL-Bhilai steel plant despatches second rake of heat-treated rails to Indian Railways
The second rake with around 1000 Tonnes of R350 heat-treated rails in 260 metre length was despatched to Indian Railways from SAIL-Bhilai Steel Plant on 20th April 2024.
SAIL-Bhilai steel plant despatches second rake of heat-treated rails to Indian Railways Read More