![](https://i0.wp.com/newsriveting.com/wp-content/uploads/2024/04/IMG-20240412-WA0201.jpg?resize=348%2C215&ssl=1)
NTPC Lara starts stage-II work
It is to mention that Prime Minister Narendra Modi laid the foundation stone for this project on 24th February 2024.
NTPC Lara starts stage-II work Read MoreUnputdownable commentary on corporate, power & politics
It is to mention that Prime Minister Narendra Modi laid the foundation stone for this project on 24th February 2024.
NTPC Lara starts stage-II work Read MoreConstruction of stage-II 1600 megawatt (800×2) has been started and it is expected to be completed in 4 years.
NTPC Lara to have carbon neutral look Read MoreNTPC Lara is on the verge of expansion. In the near future it is going to add another 1600 megawatt by installing two more 800 megawatt units.
NTPC Lara celebrates 11th Raising Day Read MoreIn November last year, NTPC dispatched the first coal rake from captive Talaipalli coal mines to Lara Super Thermal Power Project in Chhattisgarh.
NTPC starts commercial operation at Talaipalli coal project in Chhattisgarh Read MoreThe 65-km-long electrified MGR System will play a key role in generation of low cost and reliable power from NTPC Lara, thus strengthening Energy Security of the country.
Prime Minister dedicates MGR System at NTPC Lara Read MoreSimilar to the stage one, the stage two project will have 1600 MW capacity and will entail an investment of over Rs 15,500 crore.
NTPC Board approves Lara station expansion plan in Chhattisgarh Read MoreGirl Empowerment Mission (GEM) is a flagship Corporate Social Responsibility initiative of NTPC Limited,
NTPC RED (WR-II & OS) interacts with guardians and GEM participants at Lara Read MoreTeam News Riveting Raipur, May 18 The Lara station of the National Thermal Development Corporation (NTPC) Limited organised shift charge engineer meet on Wednesday. Arindam Sinha, ED (OS) inaugurated the …
NTPC Lara holds shift charge engineer meet 2023 Read MoreNTPC Lara, the 1600-megawatt power station of state-run National Thermal Power Corporation (NTPC) Limited celebrates its raising day on 13th December 2022.
NTPC Lara celebrates its raising day with gaiety Read MoreNational Thermal Power Corporation (NTPC) limited today dispatched the first coal rake from captive Talaipalli coal mines to Lara Super Thermal Power Project in Chhattisgarh.
Chhattisgarh: NTPC chugs coal from captive mine to Lara plant Read More