Maintenance Heads’ meet at NTPC Nava Raipur
The event marked with presentation on various critical aspects of maintenance besides open house discussion and sharing the best practices.
Maintenance Heads’ meet at NTPC Nava Raipur Read MoreUnputdownable commentary on corporate, power & politics
The event marked with presentation on various critical aspects of maintenance besides open house discussion and sharing the best practices.
Maintenance Heads’ meet at NTPC Nava Raipur Read MoreC Sivakumar, RED (WR-II, USSC and Ash NI) and Arindam Sinha, ED-OS administered the “Rashtriya Ekta Diwas Pledge” to all employees in Hindi and English respectively.
NTPC celebrates Ekta Diwas at Naya Raipur Read MoreNTPC Coal stations achieved a Plant Load Factor of 76.62 per cent as against the National Average of 68.75 per cent during H1 FY24.
NTPC declares first interim dividend of Rs 2.25 per share for FY24 Read MoreThe occasion marked with presentations from various sections highlighting issues, challenges and opportunities ahead.
NTPC conducts ‘Heads of Site C&M and Stores Meet’ at Naya Raipur Read MoreBeing a pit head power station with ultra supercritical technology, this project will also help the state of Telangana with low-cost power.
Prime Minister dedicates most modern plant of NTPC in India Read MoreThe event was held at NTPC Naya Raipur office and was led by C Sivakumar, Regional Executive Director (RED) (WR-II, USSC and ASH NI).
NTPC Naya Raipur employees joins Swachhata drive Read MoreIn November last year, NTPC dispatched the first coal rake from captive Talaipalli coal mines to Lara Super Thermal Power Project in Chhattisgarh.
NTPC starts commercial operation at Talaipalli coal project in Chhattisgarh Read MoreDiscussions were held on gamut of issues from competency to forced outages, unit capabilities and safety aspects, etc.
NTPC Director (operations) bats for bracing new entrants Read MoreWith this, standalone and group commercial capacity of NTPC will become 57838 MW and 73824 MW respectively.
NTPC’s Telangana Super Thermal Power Project starts commercial operation Read MoreA 1989 batch Instrumentation and Control Engineering graduate from Birla Institute of Technology and Sciences (BITS), Pilani, Gupta was CGM in NTPC Ltd. prior to joining BHEL.
Tajinder Gupta takes over as Director (Power) of BHEL Read More